

+1 470 641 2562



chad@shawengr.com

  • Follow
  • Follow
Shaw Consulting Services
  • Home
  • About Us
  • Services
    • Thermographic Scanning
    • Infrared Thermography Services
    • Electrical Metering Solutions
    • Electrical Engineering Consulting Services
    • Arc Flash Assessment Services
    • Infrared Electrical Inspection Services
  • Careers
  • FAQs
  • News
  • Contact Us
Request A Quote
  • Home
  • About Us
  • Services
    • Thermographic Scanning
    • Infrared Thermography Services
    • Arc Flash Assessment Services
    • Electrical Metering Solutions
    • Electrical Engineering Consulting Services
    • Infrared Electrical Inspection Services
  • FAQs
  • News
  • Contact Us
  • Get A Quote
How to Read Your Arc Flash Study Report: A Plain-English Guide for Facility Managers

How to Read Your Arc Flash Study Report: A Plain-English Guide for Facility Managers

by Shaw Consulting Services | Flash Risk Assessments & More | Aug 10, 2026 | Arc Flash

An arc flash study report tells you how much energy could be released at each point in your electrical system during a fault, what protective equipment workers need, and where your highest-risk areas are. The problem is that most of these reports are written by...
How Thermographic Scanning Supports Arc Flash Risk Reduction Strategies

How Thermographic Scanning Supports Arc Flash Risk Reduction Strategies

by Shaw Consulting Services | Flash Risk Assessments & More | May 10, 2026 | Arc Flash, Infrared, Thermal Imaging

Arc flash assessments and thermographic scanning are often treated as separate line items on a facility’s safety budget: two independent services, scheduled independently, producing separate reports that live in separate binders. That separation is a missed...
What Are “Normal Operating Conditions” According to NFPA 70E—and When Is PPE Required?

What Are “Normal Operating Conditions” According to NFPA 70E—and When Is PPE Required?

by Shaw Consulting Services | Flash Risk Assessments & More | Jul 3, 2025 | Arc Flash, Blog, NFPA 70E

When working with energized electrical equipment, knowing when PPE is required can prevent serious injury—and confusion. According to NFPA 70E Table 130.5(C), if you’re operating a breaker under normal operating conditions and it’s not the first time...
Why Industrial Insurance Providers Are Asking for Arc Flash Assessments

Why Industrial Insurance Providers Are Asking for Arc Flash Assessments

by Shaw Consulting Services | Flash Risk Assessments & More | May 31, 2025 | Arc Flash, Blog, NFPA 70E

If you’re a plant or facility manager, an electrical engineer, or a safety officer in manufacturing, warehousing, or utilities, you probably feel the pressure these days when it comes to arc flash safety. Insurance companies are getting stricter about arc flash...
Why An Arc Flash Risk Assessment Should Be a Priority in Electrical Engineering Projects

Why An Arc Flash Risk Assessment Should Be a Priority in Electrical Engineering Projects

by Shaw Consulting Services | Flash Risk Assessments & More | Dec 17, 2024 | Arc Flash, Blog

If you’re managing an electrical engineering project, safety is probably always on your mind. One of the biggest risks in electrical work is the potential for an arc flash. These powerful electrical explosions don’t just cause equipment damage—they pose serious risks...
« Older Entries
Shaw Consulting Services, LLC
  • Follow
  • Follow

Quick Links

Home

About Us

Services

Careers

FAQs

News

Privacy Policy

Our Newsletter

Join our mailing list.

Copyright © 2026 Shaw Consulting Services, LLC

Powered by