If you’re managing an electrical engineering project, safety is probably always on your mind. One of the biggest risks in electrical work is the potential for an arc flash. These powerful electrical explosions don’t just cause equipment damage—they pose serious risks to anyone nearby. That’s why an arc flash risk assessment should be a top priority.

In this post, we’ll explain why arc flash risk assessments are critical for any electrical project, how they work, and the benefits they offer, from preventing accidents to saving on costs.

 

What is an Arc Flash?

An arc flash is an intense burst of electrical energy caused by a fault or short circuit in an electrical system. When an arc flash happens, the energy released is powerful enough to cause serious burns, damage hearing and vision, and even result in fatal injuries. Temperatures during an arc flash can reach up to 35,000 degrees Fahrenheit—hotter than the surface of the sun.

 

Why Arc Flash Risk Assessments Matter

Arc flash risk assessments aren’t just a good idea; they’re a critical safety measure. By conducting an arc flash assessment, you’re identifying potential hazards and understanding what needs to be done to protect everyone involved.

This assessment provides essential data, including:

  • The incident energy level of equipment.
  • The required Personal Protective Equipment (PPE).
  • Safe working distances to minimize risk.
  • Potential system vulnerabilities.

With this information, you can set up protocols and procedures to reduce the chances of an arc flash and provide your team with the knowledge they need to work safely.

 

How an Arc Flash Assessment Benefits Electrical Engineering Projects

Let’s be real—no one wants delays, costly repairs, or, worse, injuries. Arc flash assessments offer multiple benefits, including:

  • Enhanced Safety: The assessment identifies where hazards are likely to occur, allowing you to reduce risks and create a safer work environment.
  • Regulatory Compliance: Following NFPA 70e and OSHA guidelines is essential, and arc flash assessments help ensure your project meets these safety standards.
  • Reduced Downtime and Costs: By identifying risks ahead of time, you avoid unexpected breakdowns, which can disrupt your project timeline and lead to extra costs.
  • Improved Liability Management: In the event of an incident, having conducted a thorough risk assessment shows that your company takes safety seriously, which can help reduce liability.

 

Key Components of an Arc Flash Risk Assessment

An arc flash assessment involves several steps, starting with a thorough evaluation of your electrical system. Here’s a look at the key components:

  1. Data Collection: The assessment begins with gathering information about your electrical system, including equipment specifications, fault currents, and system configuration.
  2. System Modeling and Analysis: Using the collected data, engineers create a model of the electrical system to analyze potential arc flash scenarios.
  3. Incident Energy Calculations: Calculations determine the energy levels workers may be exposed to in an arc flash event.
  4. Labeling and Documentation: Proper labels are applied to equipment to communicate PPE requirements, incident energy levels, and safe working distances.

 

How Often Should You Conduct an Arc Flash Assessment?

Arc flash risk assessments aren’t a one-and-done deal. It’s recommended to conduct an assessment at least every five years or whenever there are significant changes to your electrical system. If you’ve added new equipment, upgraded systems, or made structural changes, these updates could affect the arc flash risk in your facility.

 

Why Work with Shaw Consulting Services, LLC for Your Arc Flash Assessment?

At Shaw Consulting Services, LLC, we specialize in arc flash risk assessments that prioritize safety, accuracy, and compliance. Our experienced team will work closely with you to assess your system, identify potential hazards, and provide you with a comprehensive report and safety recommendations. We’re committed to helping you keep your team safe and your project running smoothly.

 

When it comes to electrical engineering projects, safety isn’t something to leave to chance. Making an arc flash risk assessment a priority means you’re taking a proactive approach to protect your team, meet regulatory requirements, and prevent costly disruptions. Contact Shaw Consulting Services, LLC today to learn more about our arc flash assessment services and keep your projects safe from start to finish.

Other Recent Articles

Infrared Electrical Inspection Tool

What to Expect During an Infrared Electrical Inspection: Process, Tools, and Reporting

Complete guide to the infrared electrical inspection process for safety officers and facility managers. Learn about thermography tools, procedures, reporting, and what happens from scheduling to delivery.

Engineering Consultant working for Electrical Compliance

Engineering Consulting for Electrical Compliance: When to Bring in the Experts

Every facility manager faces this question at some point: Can we handle this electrical compliance issue in-house, or do we need to bring in outside engineering consulting expertise? It's not always an easy call. You've got capable maintenance teams, limited budgets,...
Advanced Electrical Metering for Load Forecasting

Beyond the Basics: Using Electrical Metering for Load Forecasting and Sustainability Goals

Learn how advanced electrical metering goes beyond compliance to support EV infrastructure planning, solar integration, energy efficiency initiatives, and long-term sustainability goals

Electrical engineer reviewing arc flash assessment data while inspecting facility switchgear for safety and future planning

How Arc Flash Assessments Support Long-Term Facility Planning and Upgrades

Discover how arc flash assessment data informs smarter infrastructure decisions, equipment upgrades, and long-term safety planning beyond basic compliance requirements.

Arc-rated electrical safety helmet for NFPA 70E arc flash protection

Understanding Electrical Personal Protective Equipment (PPE): Choosing the Right Gear for the Job

You've got a facility to run, teams depending on you to keep things safe, and let's be honest, the stakes couldn't be higher when it comes to electrical work. Every time one of your electricians opens a panel or works near energized equipment, you're thinking about...
Electrical Design Services

Integrating Electrical Design Services with Safety Protocols: Best Practices for a Safer Workplace

When it comes to workplace electrical safety, the adage "an ounce of prevention is worth a pound of cure" couldn't be more accurate. Yet many facilities approach electrical design and safety protocols as separate concerns, addressing safety issues only after systems...
Arc Flash Awareness

Arc Flash Awareness: Why Your Workers’ Lives Depend On It

Arc flash incidents happen without warning — but training saves lives. Learn how awareness, NFPA 70E compliance, and PPE keep your workers safe.

Electrical Safety Tips

Essential Electrical Safety Tips Every Facility Manager Should Know

Let's be real: managing a facility is like juggling chainsaws while riding a unicycle. You're dealing with HVAC complaints, coordinating maintenance schedules, and somehow you're supposed to be an expert on every system in your building, including the electrical...
EV Infrastructure Design Services

Planning for the Future: EV Infrastructure Design Services That Actually Work for Your Business

The electric vehicle revolution isn't coming. It's here. If you're managing commercial or industrial properties, you've probably noticed more EVs in your parking lots and gotten questions about charging options from tenants and employees. Here's the challenge:...
LOTO Programs

How to Develop an Effective LOTO Program That Actually Protects Your Workers

Electrical accidents don't announce themselves. One moment, your team is performing routine maintenance, and the next, you're dealing with a life-threatening situation that could have been prevented. If you're a facility manager, safety director, or operations...